Vimercate New Hospital: trigeneration plant


The Vimercate New Hospital with a consumer of 583 beds, has chosen to provide for the energy needs of the building through a trigeneration plant of more than 6 Mwel.

Kind of plant:  trigeneration
Status: connected to the electric national grid in 2010
Power: 6042 kWel; 6520 kWter; 4100 kWfr
Kind of machine: 3 cogeneration units Tedom T2000 SPE + 3 absorption chillers + 3 boilers
Econimical benefits:  30% of annual savings on the costs of energy supply; pay back less than 3 years
Environmental benefits:

  • 10790 ton CO2/ year
  • 4552 TEP/year